Electrode mount, high pressure discharge lamp using the same, and manufacturing methods of electrode mount and high pressure discharge lamp

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8795019
APP PUB NO 20120286656A1
SERIAL NO

13395733

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

To prevent bending of an electrode shaft portion by a method which requires minimum increase in production cost, in an electrode mount for a high pressure discharge lamp. A manufacturing method of an electrode mount for the high pressure discharge lamp includes: a process of subjecting the electrode mount to a heat treatment, the electrode mount including an electrode and a metal foil which are welded to each other; and an oxidation process of producing an oxide on a surface of the electrode shaft portion of the electrode by laser irradiation to form an oxidation portion on the surface, wherein a laser irradiation position is determined such that a whole or part of the oxidation portion is included in a sealing portion of the high pressure discharge lamp when the electrode mount is embedded in the sealing portion.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IWASAKI ELECTRIC CO LTDTOKYO 103-0004

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ohno, Atsushi Gyoda, JP 11 17
Takemasa, Shinichi Gyoda, JP 2 0
Tominaga, Kazushi Gyoda, JP 4 11

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00