Preparation of maytansinoid antibody conjugates by a one-step process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8795673
APP PUB NO 20120253021A1
SERIAL NO

13434451

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides a one-step process for preparing a cell-binding agent cytotoxic agent conjugate comprising contacting a cell-binding agent with a cytotoxic agent to form a first mixture comprising the cell-binding agent and the cytotoxic agent and contacting the first mixture comprising the cell-binding agent and the cytotoxic agent with a bifunctional crosslinking reagent, which provides a linker, in a solution having a pH of about 4 to about 9 to provide a second mixture comprising the cell-binding agent cytotoxic agent conjugate, wherein the cell-binding agent is chemically coupled through the linker to the cytotoxic agent, free cytotoxic agent, and reaction by-products. The second mixture is then optionally subjected to purification to provide a purified cell-binding agent cytotoxic agent conjugate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
IMMUNOGEN INC830 WINTER STREET WALTHAM MA 02451

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Xinfang Chestnut Hill, US 12 183
Worful, Jared M Somerville, US 7 143

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00