Hybrid interconnect structure for performance improvement and reliability enhancement

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8796854
APP PUB NO 20130221529A1
SERIAL NO

13838956

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid interconnect structure (of the single or dual damascene type) is provided in which a dense (i.e., non-porous) dielectric spacer is present on the sidewalls of a dielectric material. More specifically, the structure includes a dielectric material having a conductive material embedded within at least one opening in the dielectric material, wherein the conductive material is laterally spaced apart from the dielectric material by a diffusion barrier, a dense dielectric spacer and, optionally, an air gap. The presence of the dense dielectric spacer results in a hybrid interconnect structure that has improved reliability and performance. Moreover, the hybrid interconnect structure provides for better process control which leads to the potential for high volume manufacturing.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Shaw, Thomas M Peekskill, US 84 1410
Wong, Keith Kwong Hon Wappingers Falls, US 241 2678
Yang, Chih-Chao Glenmont, US 1031 7515
Yang, Haining S Wappingers Falls, US 176 3899

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00