Control of a power transmission system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8798800
APP PUB NO 20130054035A1
SERIAL NO

13323432

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The invention provides improved control of a power transmission system having a first group of measurement units in a first geographical area providing a first set of phasors and a second group of measurement units in a second geographical area providing a second set of phasors, where the phasors in the sets are generated at the same instant in time. In this system the power control device includes a phasor aligning unit that time aligns the first and second sets of phasors and a control unit that compares each set of phasors with a corresponding phasor number threshold, determines that a first control condition is fulfilled if each phasor number threshold has been exceeded and enables the provision of a common signal if the first control condition is fulfilled. The common signal is based on the obtained phasors in the first and second sets.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • ABB RESEARCH LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Berggren, Bertil Vasteras, SE 39 402
Korba, Petr Turgi, CH 10 154
Majumder, Rajat Vasteras, SE 8 42
Ray, Swakshar Vasteras, SE 7 32

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 5, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00