Optical line terminal (OLT) and method therefore for performing in-band and out-band OTDR measurements

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8805183
APP PUB NO 20130202290A1
SERIAL NO

13478970

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An OLT operable in a PON and structured to perform OTDR measurements. The OLT comprises an electrical module for generating continuous downstream signals and processing received upstream burst signals according to a communication protocol of the PON; an optical module for transmitting continuous optical signals over a first wavelength, receiving optical upstream burst signals over a second wavelength, and transmitting optical upstream burst signals over a third wavelength, wherein the optical module further includes an ONU traffic processing module being electrically coupled to the optical module and the electrical module, wherein the ONU traffic processing module is configured to emulate one of a plurality of ONUs of the PON, to generate an analysis pattern to be transmitted as an optical upstream burst signal over a third wavelength, and analyze an analysis pattern received in an optical upstream burst signal for the purpose of performing the OTDR measurements.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • AVAGO TECHNOLOGIES GENERAL IP (SINGAPORE) PTE. LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Dvir, Amiad Nes-Ziona, IL 20 135

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00