System, method, and apparatus for actively managing consumption of electric power supplied by one or more electric power grid operators

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8806239
SERIAL NO

13463781

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A server manages consumption of power supplied by utility or electric power grid operator(s) to multiple power consuming devices. Power flow to the consuming devices is enabled and disabled by controllable devices controlled by one or more client devices. The server includes a command processor, event manager, database, and client device manager. The command processor receives commands from the operator(s) and issues event messages responsive thereto. The event manager maintains a power management status for each client device and issues event instructions responsive to event messages. The database stores information relating to power consumed by the consuming devices. The client device manager selects from the database, responsive to receipt of a power reduction event instruction, client device(s) to which to issue a message indicating a power reduction amount and/or identification of at least one controllable device to be instructed to disable power flow to associated consuming devices.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CAUSAM ENTERPRISES INC14460 FALLS OF NEUSE RD SUITE 149-302 RALEIGH NC 27614

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Forbes,, Jr Joseph W Raleigh, US 198 7345

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00