Communication of conditions at a primary storage controller to a host

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8806268
APP PUB NO 20130086415A1
SERIAL NO

13249000

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A primary storage controller is maintained in a copy relationship with a secondary storage controller, wherein the primary and secondary storage controllers are coupled to a host that is configurable to use the secondary storage controller instead of the primary storage controller. The primary storage controller determines occurrence of at least one condition in the primary storage controller, wherein the at least one condition occurs prior to a failure of the host to perform an Input/Output (I/O) operation with respect to at least one storage volume of the primary storage controller. The primary storage controller communicates the occurrence of the at least one condition to the host, wherein in response to the communicating the host is configured to determine whether to use the secondary storage controller instead of the primary storage controller based on the occurrence of the at least one condition.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Petersen, David B Virginia Falls, US 45 1216
Spear, Gail A Tucson, US 58 903

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 12, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00