Flail motor head attachment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8806844
APP PUB NO 20130219847A1
SERIAL NO

13404959

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A flail rotor head attachment for use with any type harvesting machine having crop residue processing elements and including an input opening for receiving crop residue. The attachment includes a frame structure for operatively coupling the attachment to the harvesting machine, a flail rotor and an auger each mounted on the frame structure and a drive mechanism for rotating the flail rotor and the auger in the same direction. The flail rotor includes a plurality of cutting elements for picking up and chopping crop residue from a field, each of the cutting elements being attached to a separate bracket member for allowing free movement of each relative to each other. The auger includes at least two flightings positioned in opposite directions for funneling crop residue towards the opening of the harvesting machine. A shield member is positioned under the auger and adjacent to the flail rotor to facilitate the funneling of the crop residue from the flail rotor to the auger.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • DOM, L.L.C.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Miller, Benton Lloyd North Platte, US 2 17
Sides, Michael Paul Hershey, US 2 17

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00