Semiconductor device and method of forming shielding layer over semiconductor die mounted to TSV interposer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8810011
SERIAL NO

13571020

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A semiconductor device has a plurality of conductive vias formed partially through a substrate. A conductive layer is formed over the substrate and electrically connected to the conductive vias. A semiconductor die is mounted over the substrate. An encapsulant is deposited over the semiconductor die and substrate. A trench is formed through the encapsulant around the semiconductor die. A shielding layer is formed over the encapsulant. The trench is formed partially through the substrate and the shielding layer is formed in the trench partially through the substrate. An insulating layer can be formed in the trench prior to forming the shielding layer. A portion of the substrate is removed to expose the conductive vias. An interconnect structure is formed over the substrate opposite the semiconductor die. The interconnect structure is electrically connected to the conductive vias. The shielding layer is electrically connected to the interconnect structure.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STATS CHIPPAC PTE. LTE.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Pagaila, Reza A Singapore, SG 161 5932

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00