Control device for internal combustion engine

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8812214
APP PUB NO 20130191010A1
SERIAL NO

13878831

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An internal combustion engine control device the present invention provides is a control device that can realize both of request torque and a request A/F for each of cylinder groups with high precision, even when the request A/F differs at each of the cylinder groups. The present control device sets a reference A/F within a range from the leanest A/F to the richest A/F out of the request A/Fs to the respective cylinder groups. The present control device calculates a target air quantity for realizing the request torque under the reference A/F, based on data that defines a relation between engine output torque and an air quantity in relation to an A/F. The present control device controls a throttle opening in accordance with the target air quantity, and controls fuel injection amounts of the respective cylinders in accordance with the request A/F s to the respective cylinder groups.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • TOYOTA JIDOSHA KABUSHIKI KAISHA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kawakami, Hajime Susono, JP 45 568
Okazaki, Shuntaro Sunto-gun, JP 82 360
Shibayama, Masashi Sunto-gun, JP 12 28
Shokatsu, Kaoru Susono, JP 6 11
Yoshizaki, Satoshi Gotemba, JP 61 163

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 19, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00