Scroll-rotation prevention assembly of scroll compressor

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8814545
APP PUB NO 20130209304A1
SERIAL NO

13419427

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A scroll-rotation prevention assembly of a scroll compressor includes a fixed scroll, an orbiting scroll and an Oldham ring. The fixed scroll is positioned in the compressor and has a body. Two blocks extend from the periphery of the body. The orbiting scroll is disposed to correspond to the fixed scroll and has a main body. Two protrusions extend from the periphery of the main body. The Oldham ring is sandwiched between the body of the fixed scroll and the main body of the orbiting scroll. The Oldham ring has a first surface provided with a pair of first troughs and a second surface opposite to the first surface. The second surface is provided with a pair of second troughs. Each protrusion is slidably connected in the first troughs. Each block is slidably connected in the second troughs. Thus, the wear of the Oldham ring can be reduced.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FU SHENG INDUSTRIAL CO LTDTAIPEI CITY 104

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Hsun-An Taipei, TW 3 9
Tarng, Guang-Der Taipei, TW 20 105
Wei, Chih-Hao Taipei, TW 6 21
Yeh, Chung-Hung Taipei, TW 5 4

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00