Preventing FIN erosion and limiting Epi overburden in FinFET structures by composite hardmask

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8815668
APP PUB NO 20140159166A1
SERIAL NO

13708126

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A FinFET structure is formed by forming a hardmask layer on a substrate including a silicon-containing layer on an insulating layer. The hardmask layer includes first, second and third layers on the silicon-containing layer. An array of fins is formed from the hardmask layer and the silicon-containing layer. A gate is formed covering a portion but not all of a length of each of the array of fins. The portion covers each of the fins in the array. The gate defines source/drain regions on either side of the gate. A spacer is formed on each side of the gate, the forming of the spacer performed to remove the third layer from portions of the fins in the source/drain regions. The second layer of the hardmask layer is removed from the portions of the fins in the source/drain regions, and the fins in the source/drain regions are merged.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Basker, Veeraraghavan S Schenectady, US 487 4272
Leobandung, Effendi Wappingers Falls, US 536 4756
Yamashita, Tenko Schenectady, US 599 4956
Yeh, Chun-chen Clifton Park, US 417 3463

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00