Use of contacts to create differential stresses on devices

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8815671
APP PUB NO 20120074502A1
SERIAL NO

12892474

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein are various methods and structures using contacts to create differential stresses on devices in an integrated circuit (IC) chip. An IC chip is disclosed having a p-type field effect transistor (PFET) and an n-type field effect transistor (NFET). One embodiment of this invention includes creating this differential stress by varying the deposition conditions for forming PFET and NFET contacts, for example, the temperature at which the fill materials are deposited, and the rate at which the fill materials are deposited. In another embodiment, the differential stress is created by filling the contacts with differing materials that will impart differential stress due to differing coefficient of thermal expansions. In another embodiment, the differential stress is created by including a silicide layer within the NFET contacts and/or the PFET contacts.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ellis-Monaghan, John J Grand Isle, US 254 2534
Gambino, Jeffrey P Westford, US 531 7344
Peterson, Kirk D Jericho, US 152 1144
Rankin, Jed H Richmond, US 208 4551
Robison, Robert R Colchester, US 96 655

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00