Method and apparatus for analyzing multiphase fluid flow using a multivariate optical element calculation device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8817264
APP PUB NO 20140020462A1
SERIAL NO

13870202

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method is presented for analyzing a multiphase fluid flowing through a tubular. A sample fluid flow of multiphase fluid (a mixture of some combination of gas, liquid and solid) is separated from a primary tubular, such as with a probe which traverses the tubular. At least one property of the multiphase fluid is determined using at least one multivariate optical element (MOE) calculating device. Measured properties include the presence, proportional amount, mass or volumetric flow rate, and other data related to a constituent of the fluid, such as CO2, H2S, water, inorganic and organic gases and liquids, or group of constituents of the fluid, such as SARA, C1-C4 hydrocarbons, etc. The multiphase fluid is preferably mixed prior to analysis. Additional data can be gathered and used to calculate derivative information, such as mass and volumetric flow rates of constituents in the tubular, etc.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Irani, Cyrus Aspi Houston, US 11 38
Kool, Hendrik Conroe, US 4 14
Mansilla, Arce Cidar Tomball, US 2 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Feb 26, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00