Adapter stabilization structure for bucket lip

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8819967
APP PUB NO 20130247427A1
SERIAL NO

13761273

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A ground engaging support structure such as an adapter is mounted on the front edge of an excavating bucket lip in a manner inhibiting side-to-side movement of the installed adapter, and shielding the front bucket lip edge from operational wear at the adapter installation location using opposing tapered block members secured to the front lip edge for movement toward a forwardly projecting stabilizing portion of the lip edge. As the adapter is telescoped onto the front lip edge over its stabilizing projection, correspondingly tapered portions of the adapter engage the block members and move them toward one another and toward the stabilizing projection. Rear leg portions of the adapter are then suitably secured to the bucket lip. The repositioned block members interposed between the adapter the front bucket lip edge then inhibit side-to-side shifting of the installed adapter while also shielding the lip edge from operational abrasion wear.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HENSLEY INDUSTRIES INC2108 JOE FIELD ROAD DALLAS TX 75229

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Campomanes, Patrick Washington, US 9 183

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00