Saturated steam thermodynamic cycle for a turbine and an associated installation

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8820077
APP PUB NO 20120256420A1
SERIAL NO

13331398

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A saturated steam or weakly superheated steam thermodynamic cycle in an electricity generating plant includes at least a nuclear energy source and a turbine having at least a high-pressure module, a medium-pressure module and a low-pressure module. The steam flows successively through the high-pressure, medium-pressure and low-pressure modules. The steam undergoes a first drying and/or superheating cycle between the high-pressure and medium-pressure modules and also a second cycle comprising at least a drying and/or a superheating process between the medium-pressure module and the low-pressure module.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ARABELLE SOLUTIONS FRANCE32 AVENUE PABLO PICASSO NANTERRE 92000

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Colin, Jérôme Noisy le Roi, FR 3 19
Jourdain, Vincent Paris, FR 4 2
Levan, Hoan Paris, FR 1 1

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00