Segregating flowable materials in a well

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8820405
APP PUB NO 20120103610A1
SERIAL NO

13345546

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of segregating flowable materials in conjunction with a subterranean well can include segregating flowable cement from a fluid by placing a flowable barrier substance between the cement and the fluid, and the barrier substance substantially preventing displacement of the cement by force of gravity through the barrier substance and into the fluid. Another method of segregating flowable materials can include flowing a barrier substance into a wellbore above a fluid already in the wellbore, and then flowing cement into the wellbore above the barrier substance. A system for use in conjunction with a subterranean well can include a flowable cement isolated from a fluid by a flowable barrier substance positioned between the cement and the fluid, whereby the barrier substance substantially prevents displacement of the cement by force of gravity through the barrier substance and into the fluid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HALLIBURTON ENERGY SERVICES, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lovorn, James R Tomball, US 23 346
Turner, Jay K Humble, US 3 55

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00