Method and apparatus for producing conductive polymer film

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8821706
APP PUB NO 20120085653A1
SERIAL NO

13234846

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method for producing a conductive polymer film using an apparatus comprising a prism having a working electrode, a light-emitting means, a light probe disposed on both sides of the prism, a container having an electrolytic solution containing a conductive-polymer-forming monomer and a dopant, a counter electrode immersed in the electrolytic solution, a power supply connected to a working electrode and the counter electrode, and a controller connected to the light probe and the power supply means. The method comprises determining an absorption spectrum from light reflected by the conductive polymer film, storing the relation between the absorbance of the conductive polymer film obtained from the absorption spectrum and a parameter of the conductive polymer film in the controller, and controlling current supply to the electrodes based on the relation of the absorbance and the parameter to obtain a desired parameter.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • HONDA MOTOR CO., LTD.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kagawa, Kazuhiro Wako, JP 24 68
Osawa, Masatoshi Hokkaido, JP 3 0
Qian, Pu Wako, JP 24 72

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 2, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00