Process for treating particulate material containing heavy metal and an additive for use in such process

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8834602
APP PUB NO 20120190908A1
SERIAL NO

13324813

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A process for treating particulate material containing heavy metal generated during a manufacturing process is disclosed. The process includes providing particulate material containing heavy metal within an enclosed area and mixing an additive of calcium silicate forming material with the particulate material in the enclosed area to create an additive-particulate material. The additive-particulate material can be passed into a waste collection device located downstream of the enclosed area. The calcium silicate forming material can be provided as particles with a particle size of minus 50 to plus 325 mesh. An additional aspect of the invention is an additive for use in such a process for treating metallic oxide impregnated dust, which has a particle size of plus 325 mesh and consists essentially of calcium silicate forming material.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CBL INDUSTRIAL SERVICES INCCARY IL

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Clark, Redmond R Lake Barrington, US 4 6
Lively, James A Lindenhust, US 3 33
Scott, Christopher D Crystal Lake, US 3 6

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00