Copper recovery apparatus and copper recovery method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8834715
APP PUB NO 20120234767A1
SERIAL NO

13187858

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

According to one embodiment, a copper recovery apparatus includes a precipitation tank configured to precipitate copper hydroxide grains in water, a filter aid supplier, a mixing tank configured to mix the filter aid with a water to produce a suspension, a separator provided with a filter, a line configured to supply the suspension to the separator, thereby forming a precoat layer formed of the filter aid on the filter, a separation tank configured to receive the detached matter of the precoat layer discharged together with the detaching water from the separator to magnetically separate copper hydroxide grains and filter aid, a line configure to discharge and recover the detaching water from the separation tank, and a line configured to return the separated filter aid to the filter aid supplier from the separation tank.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukaya, Taro Tokyo, JP 32 92
Kikuchi, Yasutaka Tokyo, JP 7 17
Noguchi, Hirofumi Sakai, JP 28 48
Seki, Shuji Yokohama, JP 14 69
Tsutsumi, Kenji Yokohama, JP 35 250
Yamanashi, Ichiro Tokyo, JP 12 39
Yamazaki, Atsushi Tokyo, JP 125 645

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00