Periodic destages from inside and outside diameters of disks to improve read response time via traversal of a spatial ordering of tracks

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8838905
APP PUB NO 20130132664A1
SERIAL NO

13299054

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A storage controller that includes a cache, receives a command from a host, wherein a set of criteria corresponding to read response times for executing the command have to be satisfied. A destage application that destages tracks based at least on recency of usage and spatial location of the tracks is executed, wherein a spatial ordering of the tracks is maintained in a data structure, and the destage application traverses the spatial ordering of the tracks. Tracks are destaged from at least inside or outside diameters of disks at periodic intervals, while traversing the spatial ordering of the tracks, wherein the set of criteria corresponding to the read response times for executing the command are satisfied.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Benhase, Michael T Tucson, US 240 2847
Gupta, Lokesh M Tucson, US 542 3375
Strauss, Christopher J Trabuco Canyon, US 8 142
Wright, Will A Tucson, US 13 142

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 16, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00