Power storage device comprising solid electrolyte layer over active material and second electrolyte and method of manufacturing the same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8845764
APP PUB NO 20110305958A1
SERIAL NO

13155431

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An object is to provide a power storage device with improved cycle characteristics and a method of manufacturing the power storage device. Another object is to provide an application mode of the power storage device for which the above power storage device is used. In the method of manufacturing the power storage device, an active material layer is formed over a current collector, a solid electrolyte layer is formed over the active material layer after a natural oxide film over the active material layer is removed, and a liquid electrolyte is provided so as to be in contact with the solid electrolyte layer. Accordingly, decomposition and deterioration of the electrolyte solution which are caused by the contact between the active material layer and the electrolyte solution can be prevented, and cycle characteristics of the power storage device can be improved.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SEMICONDUCTOR ENERGY LABORATORY CO., LTD.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuriki, Kazutaka Kanagawa, JP 128 1099

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00