Method of making a structured surface and article therefrom

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8845943
SERIAL NO

12974133

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A method of making a structured surface and a mechanical fastener precursor are disclosed. The method includes providing a thermoplastic backing with spaced-apart, upstanding posts with base portions attached to the thermoplastic backing and distal tips; deforming the distal tips to form caps on at least some of the spaced-apart, upstanding posts to provide capped posts, wherein at least some caps upon forming touch at least one adjacent cap; and separating the capped posts. Typically, the at least some caps upon forming are shaped at least partially by the at least one adjacent cap. The mechanical fastener precursor includes a thermoplastic backing and upstanding male fastening elements with bases attached to the thermoplastic backing and distal caps larger in area than the cross-sectional area of the bases, wherein the bases of the male fastening elements are spaced apart, wherein at least some of the distal caps touch at least one adjacent distal cap.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
3M INNOVATIVE PROPERTIES COMPANYPO BOX 33427 ST PAUL MN 55133-3427

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Hertlein, Thomas Korschenbroich, DE 10 36
Wood, Leigh E Woodbury, US 94 2873

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
7.5 Year Payment $3600.00 $1800.00 $900.00 Mar 30, 2022
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 7.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00