Converter, motor driving module, and refrigerating apparatus

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8847534
APP PUB NO 20120319630A1
SERIAL NO

13580446

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A converter includes three AC reactors, a three-phase diode bridge, a plurality of smoothing capacitors connected in series between a DC output side of the three-phase diode bridge and a DC load, two flywheel diodes connected to positive and negative terminals on the DC side of the three-phase diode bridge, respectively. A reactor is inserted between the midpoint of the two flywheel diodes and the midpoint of the smoothing capacitors, three both-way energizing switches are arranged between the AC side of the three-phase diode bridge and the midpoint of the two flywheel diodes. The three both-way energizing switches are controlled to reduce higher harmonic components of power source current, and by the reactor interposed between the midpoint of the two flywheel diodes and the midpoint of the smoothing capacitors, reverse recovery currents of the three-phase diode bridge during turn-on of the three both-way energizing switches are suppressed.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HITACHI INDUSTRIAL EQUIPMENT SYSTEMS CO LTDTOKYO 101-0022

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Li, Dongsheng Mito, JP 160 442
Notohara, Yasuo Hitachiota, JP 28 536

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Mar 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00