Raised source/drain structure for enhanced strain coupling from stress liner

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8853038
SERIAL NO

13614572

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A gate stack is formed on a silicon layer that is above a buried oxide layer. The gate stack comprises a high-k oxide layer on the silicon layer and a metal gate on the high-k oxide layer. A first nitride layer is formed on the silicon layer and the gate stack. An oxide layer is formed on the first nitride layer. A second nitride layer is formed on the oxide layer. The first nitride layer and the oxide layer are etched so as to form a nitride liner and an oxide liner adjacent to the gate stack. The second nitride layer is etched so as to form a first nitride spacer adjacent to the oxide liner. A faceted raised source/drain region is epitaxially formed adjacent to the nitride liner, the oxide liner, and first nitride spacer. Ions are implanted into the faceted raised source/drain region using the first nitride spacer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cheng, Kangguo Schenectady, US 3073 29791
Doris, Bruce Brewster, US 49 993
Khakifirooz, Ali Schnectady, US 842 11906
Kulkarni, Pranita Slingerlands, US 118 2414
Shahidi, Ghavam Pound Ridge, US 48 1105

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00