Nonvolatile resistive memory element with a metal nitride containing switching layer

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8853099
APP PUB NO 20130153845A1
SERIAL NO

13328423

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A nonvolatile resistive memory element has a novel variable resistance layer that includes a metal nitride, a metal oxide-nitride, a two-metal oxide-nitride, or a multilayer stack thereof. One method of forming the novel variable resistance layer comprises an interlayer deposition procedure, in which metal oxide layers are interspersed with metal nitride layers and then converted into a substantially homogeneous layer by an anneal process. Another method of forming the novel variable resistance layer comprises an intralayer deposition procedure, in which various ALD processes are sequentially interleaved to form a metal oxide-nitride layer. Alternatively, a metal oxide is deposited, nitridized, and annealed to form the variable resistance layer or a metal nitride is deposited, oxidized, and annealed to form the variable resistance layer.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERMOLECULAR, INC.;SANDISK TECHNOLOGIES LLC;KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chiang, Tony P Campbell, US 208 10026
Hashim, Imran Saratoga, US 125 2666
Minvielle, Tim San Jose, US 51 416
Wang, Yun San Jose, US 444 6554
Yamaguchi, Takeshi Kanagawa, JP 383 3216

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00