Process for the preparation of tapentadol

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8853456
SERIAL NO

13816292

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed herein is an improved process for the preparation of 3-[(2R,3R)-1-(dimethylamino)-2-methylpentan-3-yl]phenol of Formula-I and its pharmaceutically acceptable salt which comprises the reaction of (S)-1-(dimethylamino)-2-methylpentan-3-one of formula VIII with 3-bromo anisole of formula II under Grignard conditions to get the compound (2S,3R)-1-(dimethylamino)-3-(3-methoxyphenyl)-2-methyl pentan-3-ol of formula V followed by activation of the —OH group of the formula V to convert into sulfonate esters of formula IX, which are on reductive deoxygenation to yield (2R,3R)-3-(3-methoxyphenyl)-N,N,2-trimethylpentan-1-amine of formula VII and demethylation of formula VII to obtain the compound 3-[(2R,3R)-1-(dimethylamino)-2-methylpentan-3-yl]phenol of Formula-1.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
INDOCO REMEDIES LIMITEDINDOCO HOUSE 166 C S T ROAD SANTACRUZ (EAST) MUMBAI 400 098

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Deshmukh, Sandip Kacharu Mumbai, IN 2 2
Khabale, Somnath Ambadas Mumbai, IN 1 2
Nair, Ranjeet Mumbai, IN 9 2
Panandikar, Aditi Milind Mumbai, IN 4 2
Rajadhyaksha, Mangesh Narayan Mumbai, IN 3 3

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 7, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00