Engagement control assembly for a bi-directional overrunning clutch

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8857294
SERIAL NO

12969152

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A bi-directional overrunning clutch differential for controlling torque transmission between a pinion input shaft and at least one output hub. The clutch having a clutch housing and the roll cage mounted within the housing. An engagement control assembly is provided for controlling the relative position of the roll cage with respect to a cam surface on the clutch housing. The engagement control assembly includes an electronically controlled actuation device, such as a coil or solenoid, which when activated causes the roll cage to rotate into a second position relative to the clutch housing to engage the rolls with the cam surface and an outer surface of the hub. A spring is engaged with the clutch housing and has an end engaged with the roll cage for biasing the roll cage into a neutral position when the roll cage is in its second position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
HILLIARD CORPORATION THE100 WEST FOURTH STREET ELMIRA NY 14902-1504

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Brewer, J Brendan Elmira, US 2 51
Hasson,, Jr John Michael Elmira, US 2 39
Heath, Kelly P Corning, US 13 292
Knickerbocker, Howard J Elmira, US 6 121
Palmer, James E Erin, US 29 960

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 14, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00