Vertical pyrolysis equipment for coal material

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8864947
APP PUB NO 20130126330A1
SERIAL NO

13813708

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Disclosed is a vertical pyrolysis equipment for coal material, which comprises an enclosed kiln body with an inlet and an outlet, a flame-gas heating pipelines provided inside the kiln body, coal material propulsion and pyrolysis passage formed between the flame-gas heating pipelines and inner wall of the kiln body, coal pyrolysis gas collecting tube communicated with the coal material propulsion and pyrolysis passage provided on the kiln. The heat generated by flame-gas heating pipelines is conducted and radiated to coal powder in the coal material propulsion and pyrolysis passage. The coal powder sufficiently absorbs the heat and is pyrolyzed into fuel gas, tar gas and coal with high heat value inside the coal material propulsion and pyrolysis passage. The pyrolyzed fuel gas and tar gas are transferred to the gas dedusting-liquifying mechanism outside the kiln through the connecting coal pyrolysis gas collecting tube for collecting, dedusting, separating and high-pressure liquefying.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
XIXIA DRAGON INTO SPECIAL MATERIAL CO LTDINDUSTRIAL ROAD 88 XIXIA NANYANG HENAN 474500

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Cao, Guochao Nanyang, CN 5 6
Huang, Xiangyun Nanyang, CN 4 6
Liu, Wei Nanyang, CN 1976 15390
Wang, Xibin Nanyang, CN 15 9
Zhu, Shucheng Nanyang, CN 19 14

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00