Process for manufacturing a power semiconductor device having charge-balance columnar structures on a non-planar surface, and corresponding power semiconductor device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8866223
APP PUB NO 20120187480A1
SERIAL NO

13434741

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An embodiment of a process for manufacturing a power semiconductor device envisages the steps of: providing a body of semiconductor material having a top surface and having a first conductivity; forming columnar regions having a second type of conductivity within the body of semiconductor material, and surface extensions of the columnar regions above the top surface; and forming doped regions having the second type of conductivity, in the proximity of the top surface and in contact with the columnar regions. The doped regions are formed at least partially within the surface extensions of the columnar regions; the surface extensions and the doped regions have a non-planar surface pattern, in particular with a substantially V-shaped groove.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • STMICROELECTRONICS S.R.L.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Frisina, Ferruccio Sant'Agata Li Battiati, IT 98 977
Guarnera, Alfio Trecastagni, IT 22 37
Saggio, Mario Giuseppe Acicastello, IT 68 152

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00