Verification harness for automatically generating a text-based representation of a graphical model

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8868401
SERIAL NO

12722168

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A system and method automatically generates an object-oriented, textual program from a graphical model, and verifies the performance of the textual program as compared to the graphical model. The graphical model may have a plurality of interconnected blocks, and each block may have a plurality of parameters. One or more of the blocks are mapped to a system object, and the block's parameters are mapped to properties of the system object. An object-oriented, executable textual string is generated automatically for the block. The generated string includes at least one command to: instantiate a system object having functionality that matches the block; set one or more properties of the system object based on the block's parameters; and run the instantiated object.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • THE MATHWORKS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ibrahim, Jihad E Boston, US 2 18
Koh, David Boston, US 31 320
Li, Zhongxin Dover, US 3 18
Ogilvie, Brian K Holliston, US 24 271
Zhang, Shi Chao Brookline, US 5 193

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Apr 21, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00