Graphene channel-based devices and methods for fabrication thereof

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8878193
SERIAL NO

13875715

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Graphene-channel based devices and techniques for the fabrication thereof are provided. In one aspect, a semiconductor device includes a first wafer having at least one graphene channel formed on a first substrate, a first oxide layer surrounding the graphene channel and source and drain contacts to the graphene channel that extend through the first oxide layer; and a second wafer having a CMOS device layer formed in a second substrate, a second oxide layer surrounding the CMOS device layer and a plurality of contacts to the CMOS device layer that extend through the second oxide layer, the wafers being bonded together by way of an oxide-to-oxide bond between the oxide layers. One or more of the contacts to the CMOS device layer are in contact with the source and drain contacts. One or more other of the contacts to the CMOS device layer are gate contacts for the graphene channel.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • GLOBALFOUNDRIES INC.

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Avouris, Phaedon Yorktown Heights, US 65 2556
Chen, Kuan-Neng Hsinchu, TW 65 967
Farmer, Damon White Plains, US 18 101
Lin, Yu-Ming Wappingers Falls, US 529 1781

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 4, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00