Pre-charge tracking of global read lines in high speed SRAM

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8879303
SERIAL NO

13733578

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

In embodiments of the invention, a memory circuit includes a static random access memory (SRAM), rows of M sense amplifiers, a global read precharge tracking control circuit controlling a precharge of global read lines, a sense amplifier output tracking circuit generating a reset sense amplifier signal for the sense amplifier control circuits, and a read delay circuit generating a trigger signal for the global read precharge tracking control circuit and the sense amplifier output tracking circuit and performing a fixed delay tracking of a read operation in a read cycle. A dummy global read line is coupled to the global read precharge tracking control circuit and returns from a half way to the top of the SRAM forming a tracking dummy global read line that determines a completion of the precharge of the global read lines before the sense amplifiers start discharging the global read lines in the read cycle.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
AVAGO TECHNOLOGIES INTERNATIONAL SALES PTE LIMITED1 YISHUN AVENUE 7 SINGAPORE 768923

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chandwani, Kamal Gujarat, IN 4 53
Sahu, Rahul Uttar Pradesh, IN 40 201
Vikash, null Karnataka, IN 16 107

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 4, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00