Distributed thermal system for nonlinear optical frequency conversion

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8891158
SERIAL NO

13916266

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A laser frequency converter includes a first substrate material forming a first planar surface that includes a first nonlinear material situated along a portion of the first planar surface of the first substrate material to perform a frequency conversion of a laser signal. The frequency converter includes a second substrate material forming a second planar surface and separated by a distance from the first planar surface of the first substrate material. The second substrate material includes a second nonlinear material situated along a portion of the second planar surface of the second substrate material to perform the frequency conversion of the laser signal in conjunction with the first non-linear material. The second nonlinear material is offset from the first nonlinear material along an axis of propagation for the laser signal.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NORTHROP GRUMMAN SYSTEMS CORPORATION2980 FAIRVIEW PARK DRIVE FALLS CHURCH VA 22042-4511

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fukumoto, Joseph M Rancho Palos Verdes, US 11 73
Komine, Hiroshi Torrance, US 34 718
Long, William H Torrance, US 10 129
Shih, Chun-Ching Palos Verdes Estates, US 19 88

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 18, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00