Method of making semiconductor assembly with built-in stiffener and semiconductor assembly manufactured thereby

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8895380
SERIAL NO

13888422

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates to a method of making a semiconductor assembly. In accordance with a preferred embodiment, the method includes: preparing a dielectric layer and a supporting board including a stiffener, a bump/flange sacrificial carrier and an adhesive, wherein the adhesive bonds the stiffener to the sacrificial carrier and the dielectric layer covers the supporting board; then removing the bump and a portion of the flange to form a cavity and expose the dielectric layer; then mounting a semiconductor device into the cavity; and then forming a build-up circuitry that includes a first conductive via in direct contact with the semiconductor device and provides signal routing for the semiconductor device. Accordingly, the direct electrical connection between the semiconductor device and the build-up circuitry is advantageous to high I/O and high performance, and the stiffener can provide adequate mechanical support for the build-up circuitry and the semiconductor device.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • BRIDGE SEMICONDUCTOR CORPORATION

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Lin, Charles WC Singapore, SG 95 1036
Wang, Chia-Chung Hsinchu, TW 164 1629

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 25, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00