Apparatus and method for source side implantation after spacer formation to reduce short channel effects in metal oxide semiconductor field effect transistors

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8896048
SERIAL NO

10861581

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention provides an apparatus and method for a metal oxide semiconductor field effect transistor (MOSFET) fabricated to reduce short channel effects. The MOSFET includes a semiconductor substrate, a gate stack formed above the semiconductor substrate, a drain side sidewall spacer formed on a drain side of the gate stack, a source side sidewall spacer formed on a source side of the gate stack, and source and drain regions. The source region is formed in the semiconductor substrate on the source side, and is aligned by the source side sidewall spacer to extend an effective channel length between the source region and drain region. The drain region is formed on the drain side in the semiconductor substrate, and is aligned by drain side sidewall spacer to further extend the effective channel length.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • SPANSION LLC;FASL LLC

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Fastenko, Pavel Sunnyvale, US 6 28
Fastow, Richard Cupertino, US 68 892
He, Yue-Song San Jose, US 69 1273
Mizutani, Kazuhiro Sunnyvale, US 32 292
Wang, Zhigang Sunnyvale, US 276 4574

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 May 25, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00