System for supplying heat to construction equipment cab

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8905321
SERIAL NO

12417256

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

An apparatus is provided that quickly elevates and maintain a construction equipment engine coolant to operating temperature in order to lower the dwell time for the operator's cab to reach a comfortable temperature level during a period when the engine is in idle and main crane functions are not operated. The apparatus includes an auxiliary hydraulic circuit for rapidly bringing engine coolant temperature up to operating temperature. Engine coolant operating temperature is achieved by inducing a hydraulic load to the engine. By inducing a hydraulic load, a horsepower load is exerted on the engine causing the engine to generate heat sufficient to raise the engine coolant to operating temperature for heating the cabin. A pressure reducing relieving valve and a pilot operated relief valve result in precise hydraulic horsepower load to the construction equipment engine. Operation of the pilot operated relief valve also warms hydraulic fluid for a hydraulic reservoir.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
MANITOWOC CRANE COMPANIES LLC2400 SOUTH 44TH STREET MANITOWOC WI 54220

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Elliott, Timothy F Chambersburg, US 4 12

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00