Hybrid current switching device

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8907234
SERIAL NO

13749743

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A hybrid current switching device has a casing which includes a main current switch having first fixed and movable contacts connected in series with first and second terminals, a power switch device connected in parallel with the main current switch and switchable between an on-state and an off-state, a secondary current switch having second fixed and movable contacts and being connected in series with the power switch device, and a movable-contacts holding shaft on which the first and second movable contacts are mounted. The contacts-holding shaft is positioned inside the casing rotating around a rotation axis to move the movable contacts between a closed position where they are coupled with the corresponding fixed contacts and an open position where they are electrically separated therefrom. The first and second movable contacts are mounted on the rotating shaft with an angular offset relative to each other when in the open position.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
ABB S P A20124 MILANO

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Antoniazzi, Antonello Milan, IT 12 70
Azzola, Lucio Bergamo, IT 50 1015

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00