Switch discovery protocol for a distributed fabric system

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8908682
SERIAL NO

13364947

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A distributed fabric system comprises a plurality of independent network elements interconnected by inter-switch links and assigned to a same group. Each network element includes one or more switching chips, a processor, and memory storing program code that is executed by the processor. The program code of each network element includes a switch discovery protocol (SDP) module. The SDP module of each network element, when executed, periodically multicasts SDP data units (SDPDUs) using one of a plurality of transmission rates. The plurality of transmission rates includes a fast transmission rate and a slow transmission rate. The transmission rate used by the SDP module of each network element is the fast transmission rate until the SDP module of that network element determines a criterion is met, in response to which the transmission rate used by the SDP module of that network element changes to the slow transmission rate.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Ghosh, Nirapada Sunnyvale, US 24 329
Kamble, Keshav Govind Fremont, US 38 709
Leu, Dar-Ren San Jose, US 89 2058
Pandey, Vijoy A San Jose, US 125 2812

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00