Performing arithmetic operations using both large and small floating point values

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8909690
SERIAL NO

13324025

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Mechanisms are provided for performing a floating point arithmetic operation in a data processing system. A plurality of floating point operands of the floating point arithmetic operation are received and bits in a mantissa of at least one floating point operand of the plurality of floating point operands are shifted. One or more bits of the mantissa that are shifted outside a range of bits of the mantissa of at least one floating point operand are stored and a vector value is generated based on the stored one or more bits of the mantissa that are shifted outside of the range of bits of the mantissa of the at least one floating point operand. A resultant value is generated for the floating point arithmetic operation based on the vector value and the plurality of floating point operands.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • INTERNATIONAL BUSINESS MACHINES CORPORATION

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Carter, John B Austin, US 39 3199
Mealey, Bruce G Austin, US 38 473
Rajamani, Karthick Austin, US 122 1820
Retter, Eric E Austin, US 61 1123
Stuecheli, Jeffrey A Austin, US 170 1215

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 9, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00