Composition for chemical conversion treatment and member having a chemical conversion coating formed by the treatment

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8916007
SERIAL NO

12676050

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The object of this present invention is to provide novel means for inhibiting elution of hexavalent chromium from a chemical conversion coating. A composition for chemical conversion treatment comprises at least 0.1 g/L of a polyphenol and at least 1.5 g/L in chromium ion equivalent of an aqueous trivalent chromium compound and has a pH of 6 or less. A chemical conversion coating formed on a metallic surface of a member by contacting the surface with the composition for chemical conversion treatment has a hexavalent chromium content of 0.04 μg/cm2 or less after exposure to an environment having a temperature of 80 degrees C. and a relative humidity of 100% for 120 hours. The content of hexavalent chromium is measured by a method compliant with EN15205. A composition containing at least 0.1 g/L of a polyphenol can be used as a composition for post-coating treatment of a chemical conversion coating obtained by conventional chemical conversion treatment.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
YUKEN INDUSTRY CO LTD50 BAWARI NODA-CHO KARIYA-SI AICHI 448-8511

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Nojima, Naruhiko Kariya, JP 3 10

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 23, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00