Semiconductor device and semiconductor device manufacturing method

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8921919
APP PUB NO 20120241845A1
SERIAL NO

13415124

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A first insulation film is on a substrate. A first resistance part is on the first insulation film. A boundary film is on the first resistance part. A second resistance part is on the boundary film. A second insulation film is on the second resistance part. A first conductive part and a second conductive part are on the second insulation film, and are isolated from each other. The first conductive part includes a first connection part penetrating the second insulation film and the second resistance part and contacting a surface of the boundary film. The second conductive part includes a second connection part penetrating the second insulation film and the second resistance part and contacting a surface of the boundary film. The first resistance part is connected to the first conductive part via the first connection part, and is connected to the second conductive part via the second connection part.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • KABUSHIKI KAISHA TOSHIBA

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Kuroe, Hiroyuki Yokkaichi, JP 1 2
Watanabe, Shoichi Kawasaki, JP 26 233

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jun 30, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00