Set for producing a threaded connection for drilling and operating hydrocarbon wells, and resulting threaded connection

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8925975
SERIAL NO

13319410

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A threaded connection includes first and second tubular components each with an axis of revolution. The first component including a male threaded end, the second component including a female threaded end, and both the male and female threaded ends finishing in a terminal surface. The threaded zones include, over a portion defined as in a self-locking make-up, threads, which before the self-locking make-up and when viewed in a longitudinal section passing through the axis of revolution of the first and second components, each include: a thread crest, a thread root, a load flank, and a stabbing flank. A width of the thread crests of each component reducing in a direction of the terminal surface of the component under consideration, while a width of the thread roots increases. A lead of the male stabbing flanks and/or load flanks is different from a lead of the female stabbing flanks and/or load flanks.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
NIPPON STEEL CORPORATIONTOKYO 100-8071

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Caron, Olivier Ramecourt, FR 6 42
Granger, Scott Valenciennes, FR 12 52
Verger, Eric Gommegnies, FR 27 287

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 6, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00