Transistor with high breakdown voltage having separated drain extensions

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8928111
SERIAL NO

13302732

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

Transistors are formed using pitch multiplication. Each transistor includes a source region and a drain region connected by strips of active area material separated by shallow trench isolation (STI) structures, which are formed by dielectric material filling trenches formed by pitch multiplication. During pitch multiplication, rows of spaced-apart mandrels are formed and spacer material is deposited over the mandrels. The spacer material is etched to define spacers on sidewalls of the mandrels. The mandrels are removed, leaving free-standing spacers. The spacers constitute a mask, through which an underlying substrate is etched to form the trenches and strips of active area material. The trenches are filled to form the STI structures. The substrate is doped, forming source, drain and channel regions. A gate is formed over the channel region. In some embodiments, the STI structures and the strips of material facilitate the formation of transistors having a high breakdown voltage.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • MICRON TECHNOLOGY, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Smith, Mike Boise, US 70 970

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 6, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00