Pedicle screw fixation system and method for use of same

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8940031
SERIAL NO

14072600

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A pedicle screw fixation system and method for use of the same are disclosed. In one embodiment, a tulip is provided for holding a head of a pedicle screw substantially along a longitudinal axis. The tulip includes opposing first and second U-shaped receiving slots aligned along a transverse axis. A rod is received by the opposing first and second U-shaped receiving slots. A coupling collar includes a plurality of resilient fingers circumferentially disposed therearound such that a snap fit engagement with the head of the pedicle screw formed. The coupling collar includes a first deformable face operable for contact with the rod. A set screw is for adapted for driving engagement through the tulip along the longitudinal axis such that a second deformable face is positioned for contact with the rod. The first and second deformable faces conform to the shape of the rod in response to forceful engagement therewith.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
EMINENT SPINE LLC7200 NORTH INTERSTATE HIGHWAY 35 BUILDING 1 GEORGETOWN TX 78626

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Courtney, Steve Plano, US 42 638
Freehill, David Temple, US 18 300

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Jul 27, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00