Multi-unit intermodal railroad well car with safety platform and handbrake

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8950341
APP PUB NO 20130255533A1
SERIAL NO

13624872

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A railroad well car includes a spaced trucks grouped in pairs, and a railcar body supported on a pair of the trucks, the body comprising a pair of spaced end structures, each end structure supported on one truck, and a well structure extending between the end structures. The well structure comprises a pair of top chord members extending between the end structures; a pair of side sills extending between the end structures. The rail car includes safety platform and handbrake wherein operator walkway platforms are included with co-planer end walkways and running boards, wherein the running boards are above the top chords of the sidewalls of the well car; and a handbrake operated with a hand wheel is mounted on one side of the railroad well car, which hand wheel extends below the top chords of the side walls of the well car whereby the hand wheel is accessible from the side of the railcar via an operator on the ground.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

  • JAC OPERATIONS, INC.

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boring, Jeff New Florence, US 3 9
Josephson, Greg P Salix, US 5 9
Lohr, Dave Storystown, US 4 27
Wissinger, Christopher S New Paris, US 7 18

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 10, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00