Composition and system for preformed thermoplastic road marking with sequential features

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8950971
APP PUB NO 20140165435A1
SERIAL NO

14047785

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present disclosure describes preformed pre-bonded thermoplastic sections comprising smaller articles where the articles and sections have planar top surfaces and planar bottom surfaces that are coplanar to each other. There is also an adhesive backing layer on the coplanar bottom surfaces so that the adhesive backing layer bridges and bonds coplanar bottom surfaces to form unified pre-bonded thermoplastic signage thereby preventing dislodging or separation of the signage during handling, movement, and/or transportation before or during application of the pre-bonded signage. The articles when properly sequenced, matched, and combined, together makeup the sections such that when the sections are also sequenced and matched the sections combine to form thermoplastic signage with a final pattern wherein the planar top surfaces include sequential features necessary to visibly aid in quick assembly of one or more unified thermoplastic signages.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
FLINT ACQUISITION CORP4161 PIEDMONT PARKWAY SUITE 370 GREENSBORO NC 27410

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Askjaer, Vagn K Trinity, US 2 22
Greer, Robert W Lexington, US 43 370

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 10, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00