Load control device for high-efficiency loads

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8957662
SERIAL NO

13458324

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A two-wire load control device (such as, a dimmer switch) for controlling the amount of power delivered from an AC power source to an electrical load (such as, a high-efficiency lighting load) includes a thyristor coupled between the source and the load, a gate coupling circuit coupled between a first main load terminal and the gate of the thyristor, and a control circuit coupled to a control input of the gate coupling circuit. The control circuit generates a drive voltage for causing the gate coupling circuit to conduct a gate current to thus render the thyristor conductive at a firing time during a half cycle of the AC power source, and to allow the gate coupling circuit to conduct the gate current at any time from the firing time through approximately the remainder of the half cycle, where the gate coupling circuit conducts approximately no net average current to render and maintain the thyristor conductive.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
LUTRON TECHNOLOGY COMPANY LLC7200 SUTER RD PATENT DEPARTMENT COOPERSBURG PA 18036

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Harte, Matthew V Emmaus, US 63 1165
Newman,, Jr Robert C Emmaus, US 174 3464
Salvestrini, Christopher J Allentown, US 36 875

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 17, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00