Method and apparatus for extended operation of steam turbines in islanding mode

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8963350
SERIAL NO

14072995

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

A steam turbine driven electric power plant with an electric generator is switchable into an islanding mode wherein a main steam turbine is shut down and a lower capacity industrial steam turbine runs the electric generator instead, to supply house power to the plant while decoupled from the power grid. This avoids operating the main steam turbine and/or its steam source at reduced ratings for which they are not optimized and keeps the plant ready for restarting. The main steam turbine, the electric machine and the industrial steam turbine are mechanically engaged or disengaged through an SSS clutch, torque converter and transmission. In another mode, the electric generator is decoupled mechanically and operated as a mechanically unloaded synchronous motor coupled to the power grid, namely as a synchronous condenser wherein phased over- or under-excitation of the motor field windings supplies reactive power to the grid.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
BECHTEL POWER CORPORATION5275 WESTVIEW DRIVE FREDERICK MD 21703-8306

International Classification(s)

  • [Classification Symbol]
  • [Patents Count]

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Boulden, Mark S Middletown, US 4 10
Gülen, Seyfettin C Middletown, US 7 31

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Aug 24, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00