Roofing products, photovoltaic roofing elements and systems using them

Number of patents in Portfolio can not be more than 2000

United States of America Patent

PATENT NO 8966850
APP PUB NO 20120017972A1
SERIAL NO

13162830

Stats

ATTORNEY / AGENT: (SPONSORED)

Importance

Loading Importance Indicators... loading....

Abstract

See full text

The present invention relates more particularly to roofing products for use with photovoltaic elements, and to photovoltaic systems that include one or more photovoltaic elements joined to a roofing substrate. In one aspect, the invention provides a roofing product including: a bituminous roofing substrate having a top surface; and roofing granules embedded in the top surface of the roofing substrate, wherein in at least one over-pressed zone of the roofing product, the roofing granules are embedded so that (a) the over-pressed zone exhibits a 0.20 gram loss or less in a rub test as described in ASTM D-4977; or (b) in the over-pressed zone the average granule embed volume fraction is at least 0.5; or (c) in the over-pressed zone, the average distance between the top of the roofing granules and the top surface of the bituminous roofing substrate is 1.0 mm or less.

Loading the Abstract Image... loading....

First Claim

See full text

Family

Loading Family data... loading....

Patent Owner(s)

Patent OwnerAddress
CERTAINTEED CORPORATIONMALVERN PA 19355

International Classification(s)

Inventor(s)

Inventor Name Address # of filed Patents Total Citations
Chihlas, Peter Lansdale, US 28 1332
Jacobs, Gregory F Oreland, US 232 6769
Jenkins, Robert L Honey Brook, US 113 3086
Kalkanoglu, Husnu M Swarthmore, US 195 6626
Shaw, Wayne E Glenn Mills, US 38 2032

Cited Art Landscape

Load Citation

Patent Citation Ranking

Forward Cite Landscape

Load Citation

Maintenance Fees

Fee Large entity fee small entity fee micro entity fee due date
11.5 Year Payment $7400.00 $3700.00 $1850.00 Sep 3, 2026
Fee Large entity fee small entity fee micro entity fee
Surcharge - 11.5 year - Late payment within 6 months $160.00 $80.00 $40.00
Surcharge after expiration - Late payment is unavoidable $700.00 $350.00 $175.00
Surcharge after expiration - Late payment is unintentional $1,640.00 $820.00 $410.00